pEarlier this week the aerial support structure was merged with the chassis. The water tank and body were also merged with the chassis as it began on the main assembly line. Next week your apparatus should finish on the main assembly line and be released to alignment and testing. The aerial device is scheduled to arrive from the Pierce aerial fabrication facility.p