Things are starting to shape up at House 2. Inside all of the framing electrical and plumbing work are complete. The new HVAC and sprinkler systems have been installed and the contractor is just about done putting up the insulation. Once thats complete they will start to hang the drywall.Outside the old asbestos shingles have been removed from the exterior of the building re-pointing of the brick work is just about done and the heated ramp has been installed.